Pasadena
Detached ADU2024

Pasadena Detached Backyard ADU

A new 650 sq ft Craftsman-influenced ADU built in the rear yard of a 1921 bungalow in Pasadena's Bungalow Heaven historic neighborhood. Designed, permitted, and built in under 11 months.

Project At a Glance
650 sq ft
Size
1 Bed
Bedrooms
$198,000
Project Cost
11 months
Total Timeline
16 weeks
Construction
$2,600/mo
Monthly Rent

All-inclusive project cost covering design, engineering, permitting, construction, and certificate of occupancy.

4.9 / 5 Rating
Google Reviews
Licensed & Insured
CA General Contractor
200+ ADUs Built
Across LA County
15+ Years
In Business
Project Story

Challenge, Solution, and Result

01
Challenge

Historic Overlay Design Compatibility Review

The property sits within Pasadena's Bungalow Heaven Landmark District — one of the most significant historic neighborhoods in Southern California. Any new structure requires design review by the Pasadena Design Commission to ensure compatibility with the area's architectural character. The homeowners had received an initial rejection from a previous contractor whose submitted design used contemporary flat-facade aesthetics that clashed with the district's Craftsman bungalow character. We were brought in to redesign and resubmit.

02
Solution

Craftsman-Authentic Design With Modern Livability

Our architectural team conducted a detailed survey of the surrounding streetscape and primary residence before drawing a single line. The new ADU design referenced the main house directly: matching exposed rafter tails, a low-slope gable roof, wood shingle siding in a complementary earth tone, divided-light windows, and a covered front porch with tapered Craftsman columns. Critically, we made the case to the Design Commission that the ADU's rear-yard placement — not visible from the street — warranted expedited review rather than full committee deliberation. The Commission agreed, and the project received administrative approval in 6 weeks rather than the standard 12-week committee cycle.

03
Result

A Craftsman ADU That Outperforms Market Rents

The finished unit is a spacious, high-quality one-bedroom that doesn't feel like an afterthought. The 9-foot coffered ceilings, Craftsman-detail built-in bookcase in the living room, and private rear garden create a living experience that commands premium rents. The homeowner leased to a Caltech visiting researcher at $2,600/month on a 24-month lease — significantly above the initial rental income projection — and has since received inquiries for the next vacancy. Annual rental income of $31,200 represents a 15.8% gross yield on construction cost.

Key Details

Build Highlights

The specific decisions, solutions, and features that defined this project.

Design Commission approval secured administratively in 6 weeks — half the standard timeline
Craftsman-authentic design: exposed rafter tails, divided-light windows, tapered porch columns
Coffered 9-foot ceilings throughout — premium for a 650 sq ft footprint
Custom built-in Craftsman bookcase in living room — unique feature that drives tenant interest
Private rear garden space with board-on-board cedar privacy fence
Wide-plank white oak LVP flooring — durable and visually generous
Two-zone mini-split HVAC — separate bedroom and living area control
Separate utility metering for gas and electric
Project Timeline

Phase-by-Phase Breakdown

From initial design through certificate of occupancy — every phase, every duration.

Design & Architecture

5 weeks

Existing conditions survey, streetscape analysis, Craftsman reference documentation, full architectural drawing set, and Design Commission application package with architectural narrative and material board.

Permitting

16 weeks

Design Commission administrative review (6 weeks), Pasadena Building & Safety plan check (8 weeks), one correction round (2 weeks). Geotechnical report not required — lot confirmed as standard flat soil condition by early soils investigation.

Construction

16 weeks

New engineered slab foundation, wood framing, roof assembly, window installation, rough mechanical, insulation, drywall, tile, cabinetry, built-ins, and all finish work. All city inspections passed on first visit.

Final Inspection & Occupancy

1 week

Final Pasadena Building Department inspection, utility activation, and certificate of occupancy issued. Unit leased within 10 days of listing.

Total Project Timeline
Design through occupancy
11 months
Investment

Project Cost: $198,000

All-inclusive — covering architectural design, engineering, permitting, full construction, and certificate of occupancy. No surprises, no change order culture.

  • Architectural design and engineering
  • All permit fees and city approval management
  • Full construction — foundation through finish
  • Final inspection and certificate of occupancy
Get a Custom Price Estimate
Project Summary
  • Location
    Pasadena
  • Project Cost
    $198,000
  • Monthly Rent
    $2,600/mo
  • Timeline
    11 months
Free Estimate

Build Something Like This on Your Property

Tell us about your property and goals. We'll confirm what's buildable, recommend the right ADU type and size, and provide a site-specific all-inclusive price estimate — free, no commitment.

  • Lot and setback review — confirm your ADU options
  • ADU type recommendation based on your goals
  • All-inclusive price estimate
  • Permit timeline for your city and jurisdiction

Request Your Free Assessment

We respond within 1 business day.

No spam, ever. We respond within 1 business day.

Common Questions

ADU Project FAQs

Answers to what Los Angeles homeowners ask most before starting a project like this one.

How long does the ADU process take from start to finish?
The full process — design through certificate of occupancy — typically takes 9–14 months in Los Angeles County, depending on the city and ADU type. Garage conversions and JADUs tend to move faster (6–9 months), while new detached ADUs typically run 10–14 months. The permit phase is usually the largest variable: LADBS currently runs 10–16 weeks for standard plan check; Santa Monica and Culver City run 12–16 weeks. We set accurate expectations upfront based on current conditions.
How much does an ADU cost in Los Angeles?
All-inclusive ADU costs in LA typically range from $80,000 for a Junior ADU (JADU) to $280,000 or more for a large detached ADU. Our pricing covers design, engineering, permitting, full construction, and the certificate of occupancy — no hidden costs. Garage conversions start from $95,000; new detached units start from $150,000. Your final price depends on size, scope, site conditions, and finish tier. We provide a detailed fixed-price estimate after the free property assessment.
Do I need to live on the property to build or rent an ADU?
No — California state law removed owner-occupancy requirements for most ADU types. You can build and rent an ADU without living on the property. A small number of older local ordinances still exist, but most LA County cities now allow non-owner-occupied ADUs freely. We confirm the specific rules for your city as part of the free property assessment.
Will my property taxes increase when I add an ADU?
In California, adding an ADU triggers a partial reassessment — only the newly constructed structure is reassessed at current market value. Your primary residence keeps its existing Prop 13 assessed value. In most cases, an ADU addition adds $80,000–$150,000 to your assessed value, resulting in roughly $900–$1,700 per year in additional property tax — a modest increase relative to rental income that typically runs $2,000–$4,200/month in the LA market.
Can I convert my garage into an ADU?
Yes — garage conversions are one of the most cost-effective ADU paths. California state law allows conversion of attached or detached garages into ADUs regardless of setbacks, provided the footprint doesn't expand. You give up the garage parking space, but most LA cities no longer require replacement parking for garage conversions. We assess your garage's structural condition, foundation type, and utility connections as part of the free property review.
Does ADU Build LA handle everything, or will I need to hire other contractors?
We handle the full process under one contract — design, architecture, engineering, permitting, and construction. You won't need a separate architect, structural engineer, or general contractor. We're an ADU-exclusive design-build firm, which means the same team that designs your ADU also builds it. You'll have one project manager as your single point of contact from initial consultation through certificate of occupancy.

Have a question not answered above?

Contact an ADU Specialist
Our Track Record

200+ ADU Projects Completed in Los Angeles

From the first consultation to the final inspection — every project follows the same disciplined process and is backed by the same team, warranty, and accountability.

Licensed & Insured General Contractor

ADU Build LA holds an active California General Contractor (B) license with CSLB and carries full general liability and workers' compensation insurance. Every subcontractor on your project is licensed, insured, and verified before they set foot on your property.

200+ ADUs Built Across LA County

We've completed over 200 ADU projects — garage conversions, detached new construction, Junior ADUs, and attached units — across every major LA-area city. That depth of experience means we've seen every site condition, every permit challenge, and every construction scenario.

15+ Years of ADU Experience

Since before the 2020 ADU law reforms, we've been building accessory dwelling units in Los Angeles. We've navigated every iteration of state ADU law, local zoning changes, and city permit process updates — institutional knowledge that directly accelerates your project.

Transparent, Fixed-Price Contracts

We don't use time-and-materials billing or open-ended design fees. Every project starts with a detailed all-inclusive fixed price covering design, engineering, permitting, and construction. What we quote is what you pay — no surprise change orders, no scope creep billing.

In-House Permit Management

Our team has submitted hundreds of permit applications across LADBS, Santa Monica, Pasadena, Glendale, Culver City, and other LA-area jurisdictions. We know each city's plan check process, common correction triggers, and expedite options — reducing wait time and managing every step for you.

Single-Contract Design-Build

Under one contract, our in-house team handles every phase — design, engineering, permitting, and construction. You won't need to coordinate between a separate architect and a separate builder. One point of contact, one schedule, full accountability from first sketch to final inspection.

Inspired by this project? Design your own ADU.

Use our interactive configurator to choose type, size, finishes, and style. See matching floor plans and get a budget estimate — before talking to anyone.

Design Your ADU
Ready to Build?

Start Your ADU Project Today

Join over 200 Los Angeles homeowners who have added rental income and lasting property value with an ADU from ADU Build LA.