Glendale Junior ADU Remodel

An attached garage and unused bonus room converted into a 480 sq ft Junior ADU on a hillside Glendale lot — navigating structural constraints and earning a multigenerational family its own private living space.

Project At a Glance
480 sq ft
Size
1 Bed
Bedrooms
$91,000
Project Cost
6 months
Total Timeline
10 weeks
Construction
Multigenerational — parents' suite
Use Case

All-inclusive project cost covering design, engineering, permitting, construction, and certificate of occupancy.

4.9 / 5 Rating
Google Reviews
Licensed & Insured
CA General Contractor
200+ ADUs Built
Across LA County
15+ Years
In Business
Project Story

Challenge, Solution, and Result

01
Challenge

Structural Unknowns in a Hillside Attached Conversion

The homeowners wanted to move their aging parents into a private unit within the existing home's footprint — avoiding the cost and timeline of new construction. The attached garage and adjacent bonus room were the obvious candidates, but a preliminary inspection revealed that one shared wall between the garage and bonus room was load-bearing in an unconventional way, tied to the hillside retaining stem wall. No structural drawings existed for the original 1962 construction, requiring a full field investigation. There was also a question about whether the existing electrical panel — a 100A original unit — could support the new unit's HVAC, kitchen, and laundry loads without a full panel upgrade.

02
Solution

Structural Engineer First, Creative Framing Solution

We brought our structural engineering partner on-site before any design work began — an approach that costs slightly more upfront but prevents redesign mid-construction. The engineer documented the unconventional load path, designed a new LVL header and temporary shoring sequence, and confirmed the stem wall was stable. The solution eliminated the wall while transferring loads cleanly to a new point-loaded post system hidden within the new partition wall. On the electrical side, our team calculated the JADU's actual load requirements and determined a 200A main panel upgrade was necessary but could be performed during construction without disrupting the main residence for more than a single day. We coordinated the panel changeover with Southern California Edison 6 weeks in advance.

03
Result

A Private Suite for Two — Completed in 6 Months

The finished JADU gives the homeowners' parents a genuinely independent living space: a private entry from the side yard, a full kitchen, a comfortable bedroom with a walk-in closet, a full bathroom with grab bars and a roll-in shower, and a small living area with southern exposure windows. The parents moved in within 6 months of the initial consultation — significantly faster than any new construction alternative. The homeowners estimate the arrangement saves the family $2,800–$3,200/month compared to assisted living or care facility costs, providing both financial and emotional value that far exceeds the construction investment.

Key Details

Build Highlights

The specific decisions, solutions, and features that defined this project.

Load-bearing wall removed safely using structural engineer-designed LVL header system
Existing stem wall investigated and confirmed stable — no foundation remediation required
200A panel upgrade coordinated with SCE — main house power interrupted for less than 8 hours
Accessibility-forward design: roll-in shower, grab bars, widened doorways (32-inch clear)
Side-yard private entry — fully separate from main house interior access
Southern exposure windows added to what had been a windowless bonus room
In-unit washer/dryer hookups — full independence from main house laundry
Separate sub-metering for electricity — transparent utility tracking
Project Timeline

Phase-by-Phase Breakdown

From initial design through certificate of occupancy — every phase, every duration.

Structural Investigation & Design

3 weeks

Structural engineer field investigation, load path documentation, LVL header design, and panel load calculation. Architectural design incorporated structural findings without requiring layout revisions.

Permitting

9 weeks

JADU permitting in Glendale moved faster than a full ADU — simpler scope and Glendale's familiarity with attached conversions. One correction round related to accessibility documentation. SCE panel upgrade pre-application submitted in parallel.

Construction

10 weeks

Structural work first: shoring, LVL installation, post system. Then new wall framing, window openings, rough electrical (including panel day), plumbing rough-in, HVAC rough-in, insulation, drywall, tile, cabinetry, and finish work.

Final Inspection & Occupancy

1 week

Glendale final inspection — all items passed. Certificate of occupancy issued. Parents moved in 4 days after final inspection.

Total Project Timeline
Design through occupancy
6 months
Investment

Project Cost: $91,000

All-inclusive — covering architectural design, engineering, permitting, full construction, and certificate of occupancy. No surprises, no change order culture.

  • Architectural design and engineering
  • All permit fees and city approval management
  • Full construction — foundation through finish
  • Final inspection and certificate of occupancy
Get a Custom Price Estimate
Project Summary
  • Location
    Glendale
  • Project Cost
    $91,000
  • Use Case
    Multigenerational — parents' suite
  • Timeline
    6 months
Free Estimate

Build Something Like This on Your Property

Tell us about your property and goals. We'll confirm what's buildable, recommend the right ADU type and size, and provide a site-specific all-inclusive price estimate — free, no commitment.

  • Lot and setback review — confirm your ADU options
  • ADU type recommendation based on your goals
  • All-inclusive price estimate
  • Permit timeline for your city and jurisdiction

Request Your Free Assessment

We respond within 1 business day.

No spam, ever. We respond within 1 business day.

Common Questions

ADU Project FAQs

Answers to what Los Angeles homeowners ask most before starting a project like this one.

How long does the ADU process take from start to finish?
The full process — design through certificate of occupancy — typically takes 9–14 months in Los Angeles County, depending on the city and ADU type. Garage conversions and JADUs tend to move faster (6–9 months), while new detached ADUs typically run 10–14 months. The permit phase is usually the largest variable: LADBS currently runs 10–16 weeks for standard plan check; Santa Monica and Culver City run 12–16 weeks. We set accurate expectations upfront based on current conditions.
How much does an ADU cost in Los Angeles?
All-inclusive ADU costs in LA typically range from $80,000 for a Junior ADU (JADU) to $280,000 or more for a large detached ADU. Our pricing covers design, engineering, permitting, full construction, and the certificate of occupancy — no hidden costs. Garage conversions start from $95,000; new detached units start from $150,000. Your final price depends on size, scope, site conditions, and finish tier. We provide a detailed fixed-price estimate after the free property assessment.
Do I need to live on the property to build or rent an ADU?
No — California state law removed owner-occupancy requirements for most ADU types. You can build and rent an ADU without living on the property. A small number of older local ordinances still exist, but most LA County cities now allow non-owner-occupied ADUs freely. We confirm the specific rules for your city as part of the free property assessment.
Will my property taxes increase when I add an ADU?
In California, adding an ADU triggers a partial reassessment — only the newly constructed structure is reassessed at current market value. Your primary residence keeps its existing Prop 13 assessed value. In most cases, an ADU addition adds $80,000–$150,000 to your assessed value, resulting in roughly $900–$1,700 per year in additional property tax — a modest increase relative to rental income that typically runs $2,000–$4,200/month in the LA market.
Can I convert my garage into an ADU?
Yes — garage conversions are one of the most cost-effective ADU paths. California state law allows conversion of attached or detached garages into ADUs regardless of setbacks, provided the footprint doesn't expand. You give up the garage parking space, but most LA cities no longer require replacement parking for garage conversions. We assess your garage's structural condition, foundation type, and utility connections as part of the free property review.
Does ADU Build LA handle everything, or will I need to hire other contractors?
We handle the full process under one contract — design, architecture, engineering, permitting, and construction. You won't need a separate architect, structural engineer, or general contractor. We're an ADU-exclusive design-build firm, which means the same team that designs your ADU also builds it. You'll have one project manager as your single point of contact from initial consultation through certificate of occupancy.

Have a question not answered above?

Contact an ADU Specialist
Our Track Record

200+ ADU Projects Completed in Los Angeles

From the first consultation to the final inspection — every project follows the same disciplined process and is backed by the same team, warranty, and accountability.

Licensed & Insured General Contractor

ADU Build LA holds an active California General Contractor (B) license with CSLB and carries full general liability and workers' compensation insurance. Every subcontractor on your project is licensed, insured, and verified before they set foot on your property.

200+ ADUs Built Across LA County

We've completed over 200 ADU projects — garage conversions, detached new construction, Junior ADUs, and attached units — across every major LA-area city. That depth of experience means we've seen every site condition, every permit challenge, and every construction scenario.

15+ Years of ADU Experience

Since before the 2020 ADU law reforms, we've been building accessory dwelling units in Los Angeles. We've navigated every iteration of state ADU law, local zoning changes, and city permit process updates — institutional knowledge that directly accelerates your project.

Transparent, Fixed-Price Contracts

We don't use time-and-materials billing or open-ended design fees. Every project starts with a detailed all-inclusive fixed price covering design, engineering, permitting, and construction. What we quote is what you pay — no surprise change orders, no scope creep billing.

In-House Permit Management

Our team has submitted hundreds of permit applications across LADBS, Santa Monica, Pasadena, Glendale, Culver City, and other LA-area jurisdictions. We know each city's plan check process, common correction triggers, and expedite options — reducing wait time and managing every step for you.

Single-Contract Design-Build

Under one contract, our in-house team handles every phase — design, engineering, permitting, and construction. You won't need to coordinate between a separate architect and a separate builder. One point of contact, one schedule, full accountability from first sketch to final inspection.

Inspired by this project? Design your own ADU.

Use our interactive configurator to choose type, size, finishes, and style. See matching floor plans and get a budget estimate — before talking to anyone.

Design Your ADU
Ready to Build?

Start Your ADU Project Today

Join over 200 Los Angeles homeowners who have added rental income and lasting property value with an ADU from ADU Build LA.