Culver City
Detached ADU2024

Culver City 2-Bed Detached ADU

A two-story 750 sq ft two-bedroom ADU built in a compact Culver City rear yard — preserving outdoor space for the main house while maximizing rental income in one of LA's strongest ADU markets.

Project At a Glance
750 sq ft
Size
2 Bed
Bedrooms
$268,000
Project Cost
9.5 months
Total Timeline
18 weeks
Construction
$4,200/mo
Monthly Rent

All-inclusive project cost covering design, engineering, permitting, construction, and certificate of occupancy.

4.9 / 5 Rating
Google Reviews
Licensed & Insured
CA General Contractor
200+ ADUs Built
Across LA County
15+ Years
In Business
Project Story

Challenge, Solution, and Result

01
Challenge

Maximum Unit Size on a Compact Lot

The homeowners' goal was clear: maximize rental income with a two-bedroom unit. The challenge was fitting a 750 sq ft structure into a rear yard that also needed to remain usable for the primary residence — a constraint complicated by Culver City's setback requirements and the homeowners' desire to preserve at least a small private garden adjacent to the main house. A single-story 750 sq ft footprint would have consumed virtually the entire rear yard, requiring either a smaller unit or a two-story approach. Two-story ADUs introduce their own complexity: heightened structural requirements, more involved permitting, and neighbor notification obligations under certain Culver City conditions.

02
Solution

Compact Two-Story Footprint — 375 Sq Ft Per Floor

We recommended a two-story design from the outset — 375 sq ft per floor — which reduced the ground footprint by roughly 45% compared to a single-story configuration. This preserved a meaningful garden area for the main house while delivering every square foot of the target program. The structural design used engineered wood framing with a moment-frame system at the ground level, which eliminated the need for shear walls that would have compromised the open-plan ground-floor layout. Culver City's planning department approved the two-story design without requiring discretionary review, as the building height remained within the city's standard 16-foot ADU height limit by using a low-slope roofline. Neighbor notification proceeded without objection.

03
Result

Renting at $4,200/Month — 19% Gross Annual Yield

The finished two-bedroom ADU is a genuinely premium rental unit. Ground floor contains an open kitchen, dining, and living area with concrete-look tile floors and 10-foot ceilings. The upper floor has two bedrooms — both with western exposure for natural light — sharing a full bath with double vanity. A private rooftop deck accessible from the second floor is the feature most frequently cited by prospective tenants. The homeowners leased to an Amazon MGM Studios couple at $4,200/month on a 24-month lease. Annual gross rental income of $50,400 represents a 18.8% gross yield on construction cost and is projected to fully recover the investment within 6 years including management costs.

Key Details

Build Highlights

The specific decisions, solutions, and features that defined this project.

Two-story design reduced ground footprint 45% — preserved main house rear garden
Engineered moment-frame system enables open ground-floor plan without shear walls
10-foot ceilings on ground floor — premium for a two-story structure
Rooftop deck on second floor — most-cited feature by tenants; permitted as accessible roof deck
Concrete-look large-format tile throughout ground floor — durable, visually premium
Double vanity in upstairs bathroom — serves two-bedroom occupancy well
EV charger rough-in in adjacent parking area — future-proofed for tenant demand
Solar panel conduit pre-run — homeowner plans panel installation in Year 2
Project Timeline

Phase-by-Phase Breakdown

From initial design through certificate of occupancy — every phase, every duration.

Design & Architecture

5 weeks

Two-story feasibility study, structural concept with moment-frame system, Culver City height limit compliance review, neighbor notification package, and full architectural and structural drawing set.

Permitting

12 weeks

Culver City Community Development plan check — two-story structures receive standard review (not discretionary). Neighbor notification completed without objection. One correction round for structural drawing clarification. All permits issued at 12 weeks.

Construction

18 weeks

Engineered foundation, moment-frame ground-floor framing, second-floor assembly, rooftop deck structure, full mechanical rough-in, insulation, drywall, large-format tile, kitchen and bath, painted exterior, and rooftop deck decking and railing.

Final Inspection & Occupancy

1 week

Culver City final inspection — passed first visit. Certificate of occupancy issued. Unit leased within 8 days at asking rent.

Total Project Timeline
Design through occupancy
9.5 months
Investment

Project Cost: $268,000

All-inclusive — covering architectural design, engineering, permitting, full construction, and certificate of occupancy. No surprises, no change order culture.

  • Architectural design and engineering
  • All permit fees and city approval management
  • Full construction — foundation through finish
  • Final inspection and certificate of occupancy
Get a Custom Price Estimate
Project Summary
  • Location
    Culver City
  • Project Cost
    $268,000
  • Monthly Rent
    $4,200/mo
  • Timeline
    9.5 months
Free Estimate

Build Something Like This on Your Property

Tell us about your property and goals. We'll confirm what's buildable, recommend the right ADU type and size, and provide a site-specific all-inclusive price estimate — free, no commitment.

  • Lot and setback review — confirm your ADU options
  • ADU type recommendation based on your goals
  • All-inclusive price estimate
  • Permit timeline for your city and jurisdiction

Request Your Free Assessment

We respond within 1 business day.

No spam, ever. We respond within 1 business day.

Common Questions

ADU Project FAQs

Answers to what Los Angeles homeowners ask most before starting a project like this one.

How long does the ADU process take from start to finish?
The full process — design through certificate of occupancy — typically takes 9–14 months in Los Angeles County, depending on the city and ADU type. Garage conversions and JADUs tend to move faster (6–9 months), while new detached ADUs typically run 10–14 months. The permit phase is usually the largest variable: LADBS currently runs 10–16 weeks for standard plan check; Santa Monica and Culver City run 12–16 weeks. We set accurate expectations upfront based on current conditions.
How much does an ADU cost in Los Angeles?
All-inclusive ADU costs in LA typically range from $80,000 for a Junior ADU (JADU) to $280,000 or more for a large detached ADU. Our pricing covers design, engineering, permitting, full construction, and the certificate of occupancy — no hidden costs. Garage conversions start from $95,000; new detached units start from $150,000. Your final price depends on size, scope, site conditions, and finish tier. We provide a detailed fixed-price estimate after the free property assessment.
Do I need to live on the property to build or rent an ADU?
No — California state law removed owner-occupancy requirements for most ADU types. You can build and rent an ADU without living on the property. A small number of older local ordinances still exist, but most LA County cities now allow non-owner-occupied ADUs freely. We confirm the specific rules for your city as part of the free property assessment.
Will my property taxes increase when I add an ADU?
In California, adding an ADU triggers a partial reassessment — only the newly constructed structure is reassessed at current market value. Your primary residence keeps its existing Prop 13 assessed value. In most cases, an ADU addition adds $80,000–$150,000 to your assessed value, resulting in roughly $900–$1,700 per year in additional property tax — a modest increase relative to rental income that typically runs $2,000–$4,200/month in the LA market.
Can I convert my garage into an ADU?
Yes — garage conversions are one of the most cost-effective ADU paths. California state law allows conversion of attached or detached garages into ADUs regardless of setbacks, provided the footprint doesn't expand. You give up the garage parking space, but most LA cities no longer require replacement parking for garage conversions. We assess your garage's structural condition, foundation type, and utility connections as part of the free property review.
Does ADU Build LA handle everything, or will I need to hire other contractors?
We handle the full process under one contract — design, architecture, engineering, permitting, and construction. You won't need a separate architect, structural engineer, or general contractor. We're an ADU-exclusive design-build firm, which means the same team that designs your ADU also builds it. You'll have one project manager as your single point of contact from initial consultation through certificate of occupancy.

Have a question not answered above?

Contact an ADU Specialist
Our Track Record

200+ ADU Projects Completed in Los Angeles

From the first consultation to the final inspection — every project follows the same disciplined process and is backed by the same team, warranty, and accountability.

Licensed & Insured General Contractor

ADU Build LA holds an active California General Contractor (B) license with CSLB and carries full general liability and workers' compensation insurance. Every subcontractor on your project is licensed, insured, and verified before they set foot on your property.

200+ ADUs Built Across LA County

We've completed over 200 ADU projects — garage conversions, detached new construction, Junior ADUs, and attached units — across every major LA-area city. That depth of experience means we've seen every site condition, every permit challenge, and every construction scenario.

15+ Years of ADU Experience

Since before the 2020 ADU law reforms, we've been building accessory dwelling units in Los Angeles. We've navigated every iteration of state ADU law, local zoning changes, and city permit process updates — institutional knowledge that directly accelerates your project.

Transparent, Fixed-Price Contracts

We don't use time-and-materials billing or open-ended design fees. Every project starts with a detailed all-inclusive fixed price covering design, engineering, permitting, and construction. What we quote is what you pay — no surprise change orders, no scope creep billing.

In-House Permit Management

Our team has submitted hundreds of permit applications across LADBS, Santa Monica, Pasadena, Glendale, Culver City, and other LA-area jurisdictions. We know each city's plan check process, common correction triggers, and expedite options — reducing wait time and managing every step for you.

Single-Contract Design-Build

Under one contract, our in-house team handles every phase — design, engineering, permitting, and construction. You won't need to coordinate between a separate architect and a separate builder. One point of contact, one schedule, full accountability from first sketch to final inspection.

Inspired by this project? Design your own ADU.

Use our interactive configurator to choose type, size, finishes, and style. See matching floor plans and get a budget estimate — before talking to anyone.

Design Your ADU
Ready to Build?

Start Your ADU Project Today

Join over 200 Los Angeles homeowners who have added rental income and lasting property value with an ADU from ADU Build LA.