What Design-Build Means for ADUs
An ADU design build approach puts one team under one contract.
Get ADU design build in Los Angeles with one contract and one team. We handle design, permits, and construction for one agreed price.
Design, permits & construction under one contract · Licensed general contractor since 2009 · Free assessment, reply within 1 business day
ADU design build puts design, permits, and construction under one contract with one team. Since 2009, we have used that model on 200+ ADUs across Los Angeles County.
You get one licensed general contractor and one project manager. That manager stays with you from the first visit to final inspection. As a result, no architect and builder argue over who owns a problem. Instead, one team owns the design, the permit, and the build. Therefore, you always know who to call. Weekly written updates keep you informed along the way.

An ADU design build approach puts one team under one contract.
That team includes the designer, the engineer, and the builder. Instead of hiring an architect and a separate contractor, you hire us. We take responsibility for every phase and manage the project as one effort.
This model removes much of the friction in the traditional approach. For example, you avoid a separate handoff between designer and builder. Also, no gap opens between the architect and the contractor. Because of that, your team catches problems on paper, not on site.
ADU Build LA has delivered design-build ADUs across Los Angeles County since 2009. As a result, we know what earns LADBS approval. We also know what works on steep lots and tight urban sites. In addition, we know how to control cost without cutting quality.
The traditional route is design-bid-build.
First, you hire an architect to draw the project. Next, you bid the plans to contractors. Then you pick a builder, often the lowest bidder. This split creates friction. The architect does not know the real build cost until the design is done. Meanwhile, the contractor has no say in buildability.
| Design-Build | Design-Bid-Build |
|---|---|
| One contract, one team | Multiple contracts, multiple teams |
| One agreed price early | Price known only after design and bidding |
| Single project manager | Architect and contractor coordination |
| Buildability reviewed during design | Buildability discovered during construction |
| Changes managed within one contract | Changes renegotiated across contracts |
Design-build keeps all three roles together from day one. The architect knows the contractor's limits. In turn, the contractor sees the design as it develops. Therefore, cost, schedule, and buildability get solved together, not one after another.
In a design-build job, we agree on one scope and one price early.
That price covers design, engineering, LADBS permits, corrections, and construction through final inspection. Because of this, you see the full cost up front. You do not get a new bill at each phase.
This model also lines up our goals with yours. We want to design efficiently, permit smoothly, and build it right the first time. Rework costs us time and money, so we plan carefully. As a result, you get fewer late changes. In addition, one team means one set of drawings and one schedule.
A single scope also limits change-order surprises. If site conditions or your wishes change the plan, we talk it through openly. Then we agree on the adjustment together and put it in writing. As a result, change orders become the exception, not the default.
First, we start with a free assessment of your lot.
We check size, slope, utilities, zoning limits, and your budget. This visit tells us whether a standard model fits or the lot needs a custom design. It also gives you a rough sense of each phase.
Next comes design and engineering. Our in-house team draws your floor plans, elevations, and structural details. We also prepare electrical and plumbing layouts and Title 24 energy calculations. You review the drawings and request changes before we lock them in. Learn more about our ADU design service.
Once the design is final, we submit it to LADBS for plan check. Straightforward projects usually see approval in about 8 to 16 weeks. Meanwhile, we handle every correction and resubmission. You never chase an outside architect for answers. When LADBS approves, we pick up the permit. Our permitting service page explains each step.
Finally, construction begins. Our site team knows the design because the same company drew it. As a result, questions get answered fast. Therefore, you never wait on an outside designer. Weekly written updates keep you informed. After final inspection, you receive your certificate of occupancy and the keys.
A shared scope keeps the schedule tight and the price firm. However, this model suits some homeowners better than others.
.jpeg&w=3840&q=75)
Traditional projects often stall at handoff points.
Design finishes, and then the plans sit waiting for bids. Next, the winning bidder raises questions the designer never anticipated. As a result, these delays can add months. Each pause costs you time and money.
In a design-build model, design and construction planning overlap. While the team finishes drawings, we also order long-lead materials. We schedule crews at the same time. Therefore, when your permit arrives, we are ready to start framing. No phase waits for another.
Permit review still takes the longest. Straightforward projects usually clear LADBS in about 8 to 16 weeks. However, the rest of the schedule moves without the usual gaps. Design, engineering, construction, and closeout flow in one line. Your timeline depends on your lot and scope, so we confirm it at your free assessment.
One scope makes budgeting simple.
Your drawings, permits, and construction all tie to the same document. Therefore, we can spot costly choices early. For example, we may suggest a simpler roofline or a standard window size. You decide which trade-offs to make.
Meanwhile, finishes stay visible in the price. You choose flooring, cabinets, and fixtures with real numbers in front of you. In addition, we flag anything that pushes the total up. As a result, you control the budget instead of discovering it later. Our ADU cost guide explains what moves the total.
Design-build fits you if you want simplicity and predictability.
You have one contract, one point of contact, and one price. Because scope changes run through us alone, you renegotiate once. Therefore, nobody else needs to approve a revision. In short, you manage less and decide more.
It also suits a challenging lot. Think of steep slopes, tight access, or unusual utilities. Our in-house team adjusts the design and methods quickly. Moreover, nobody waits for an outside architect to reissue plans. Hillside lots in Los Angeles often need this kind of flexibility.
Financing is another reason people choose this model. A single price and one accountable team give a lender a clear budget and timeline. Consequently, your lender sees one clear scope instead of three. Ask your lender what they need, and we will tell you what we can provide.
However, design-build is not for everyone. Perhaps you already hired an architect. Or you want a design far beyond our standard models. In either case, we will explain your options at your free assessment. We can review outside plans and quote the build.
Design, permits, and construction sit in one price. You know the scope and total before work begins.
You do not coordinate an architect and a builder. One person answers your questions at every step.
Our designer and builder work together. Plans stay cost-efficient and permit-ready from the first sketch.
Design and construction planning overlap. As soon as your permit arrives, we start building.
Free site visit. We check your lot, zoning, utilities, and budget. Then we confirm feasibility, outline the scope, and explain the likely timeline before you commit to anything.
Our team prepares plans, elevations, structural details, and Title 24 energy calculations. Next, you review everything and request changes. Nothing goes to LADBS until you approve the final design set.
We submit your plans to LADBS and manage plan check. Then we handle every correction and resubmission. Straightforward projects usually see approval in about 8 to 16 weeks.
We build to the approved permit and schedule each inspection. Meanwhile, your project manager sends weekly written updates. After final inspection, you receive your certificate of occupancy and your finished ADU.
Your builder's crew and track record matter most. For example, in-house trades remove hand-offs between separate companies.

ADU Build LA keeps design, project management, and construction in one company.
Our team does not hand your plans to an outside firm. As a result, your design choices, permit strategy, and building methods come from the same people. Therefore, advice stays consistent from phase to phase.
Consistency shows up on site. The designer knows what we can build cost-effectively. Likewise, the builder sees the design intent and carries it out without guesswork. Your project manager understands both sides. Consequently, you get answers on site instead of waiting for a callback.
We have completed 200+ ADUs across Los Angeles County.
They include detached new builds, garage conversion units, attached additions, and junior ADUs. Each project shows how design-build handles real lot limits and real budgets. Therefore, you can judge our work before you call.
For a closer look, browse our project portfolio. You will see before-and-after photos, square footage, and the range of home styles where ADUs work. In addition, you may spot neighborhoods you know, such as Silver Lake, Echo Park, Santa Monica, and Pasadena. Also, compare our standard ADU models with the finished builds.
A general contractor can build almost anything.
That includes homes, offices, and remodels. In contrast, an ADU-focused builder like us does one thing every day. We know LADBS requirements well, and we have solved common ADU problems many times. These include utility connections, hillside access, and tying into the existing home.
That focus matters. Because of it, you get fewer mistakes and smoother permitting. Your finished ADU can also work as a rental from day one. Custom ADU builders carry this focus into every project, whether you pick a standard model or a custom design.
Final cost depends on site conditions, finishes, and local requirements. Prices shown are starting figures. Contact us for a custom estimate.
Get a free assessment. We'll review your property, explain the design-build process, and give you a realistic timeline and price range.
Start with a model that fits your lot, then customize.

Also in LA: Silver Lake · Mar Vista · and every LADBS neighborhood
View all locationsDesign-build ADU questions answered.
In an ADU design build project, one company handles everything, from first sketch to final inspection. The same team designs, engineers, permits, and builds the project. Under a traditional approach, you hire an architect first, then a separate contractor. You then coordinate between the two yourself. With design-build, however, you sign one contract instead. As a result, you get one price and one project manager. For example, the designer never draws something the builder cannot price. Therefore, one party answers for the final result.
Yes, you can bring your own architect if you already hired one. We review their plans first and then provide a construction estimate. In some cases, we build exactly to their design. However, you lose some design-build benefits in that setup. For example, you manage both the architect and us, and changes need two approvals. Still, some homeowners choose this path when they want a very specific design vision. Contact us for a free assessment, and we will explain what fits your project.
We carry the design and permit risk on every project we design and file. If LADBS requires corrections to our plans, our team makes them. That work is part of your agreed scope. However, a change you request is different. In that case, we explain the impact on price and timeline first. Then you decide whether to move forward. Plan check timing still belongs to LADBS, so we cannot promise a date. Still, straightforward projects usually take about 8 to 16 weeks.
Change orders happen less often when one team owns the scope. Clear scopes also keep the budget honest for both sides. First, we define the work clearly before construction starts. Next, we document every material and finish choice. Still, surprises can occur, such as hidden soil or utility problems. When that happens, we explain the issue and price the fix. Then you approve the change in writing before we proceed. As a result, you never pay for work you did not agree to.
We provide a 1-year workmanship warranty on your finished ADU. This covers defects in our labor that appear during normal use. Therefore, you have a full year to report any workmanship issue. Because one company built your ADU, one company stands behind it. First, contact your project manager with the details. Next, we inspect the issue and schedule the repair. In addition, prompt reports help us fix problems before they grow. Ask us for the written warranty terms during your free assessment.
Your price reflects one defined scope. We start with a free assessment of your lot and goals. Then we outline design, engineering, permits, and construction in a single estimate. Because everything sits in one scope, you compare one number, not three. Starting prices run from $60K for a Junior ADU to $150K for a detached ADU. However, final cost depends on site, scope, and finishes. For example, a hillside lot costs more to build than a flat one. Request your free estimate, and we will give you a clear range.
Your dedicated project manager is your point of contact. They stay with your ADU from the first visit through final inspection. You call them with questions, concerns, or schedule updates. Also, they send weekly written progress updates. Because they manage design and construction, they see the whole picture. Therefore, you never explain the same issue to two different companies. That continuity saves time, since nobody needs a recap at each handoff. New inquiries get a reply within 1 business day.
Your total schedule depends on your lot, scope, and design choices. LADBS plan check takes the longest, and straightforward projects see approval in about 8 to 16 weeks. Meanwhile, design and construction planning overlap, so no phase sits idle. For example, we order long-lead materials while plan check runs. Then construction starts soon after your permit arrives. Finally, we schedule each inspection and finish with your certificate of occupancy. Therefore, you avoid the dead time between design and build. We confirm a realistic timeline at your free assessment.
Ask yourself these questions to see if the design-build model fits your ADU project.
Design-build gives you a single team and one project manager, so coordination delays shrink.
We assign a dedicated project manager who stays with your project.
One scope and one price mean fewer surprise fees as phases complete.
We agree on one scope and price before work begins.
Design-build handles LADBS plan check and adapts to challenging sites.
Our in-house team manages permits and solves site constraints.
Lenders like a clear budget and a single accountable team.
A clear budget and timeline give your lender, and you, confidence.
Design-build keeps all expertise in one team from day one.
We bring 200+ ADUs of experience to every project.
Still have a question? Talk with an ADU specialist
Learn more about ADU design, permitting, cost, and construction.

4.9/5 · 94+ reviews · Reply in 1 business day